How USP compares to Atlantic Pallet for apparel & textiles pallet buyers.
Get a Price →East Coast pallet supplier. United States Pallets serves apparel & textiles operations with 50-pallet minimums (most national networks require 1,000+), sub-2-hour quote response, and audit-ready documentation.
Response under 2 business hours.
Heat-treatment chamber maintained at 56C core for 30 minutes per ISPM-15 Annex 1; each load shipped with a treatment certificate signed by a USDA-registered inspector.
FDA registered facilities in Lakeland and Jacksonville require pallets that meet FDA 21 CFR 178.3520 indirect food additive specification; our food-grade stock is tested for compliance every 90 days.
Port Tampa Bay phosphate operations under Tampa Port Authority Rule 7-04 require corrosion-resistant pallet specs; we supply heat-treated stock that withstands phosphate-rich environments.
Custom 42x42 pallet builds use 7/8 inch deck boards for telecommunications-equipment loads; nail-pattern density doubled to handle 5,000 lb static load; runner spacing optimized for 4,000 lb-capacity narrow-aisle reach trucks.
Deck board edge type defaults to chamfered for forklift safety; square-edge available on request for ASRS compatibility; rounded-edge banding tracks available for high-throughput line-side delivery.
Live-load operations bring the trailer to your dock for a 90-minute window; loader/unloader provided; suited to customers without dedicated dock space or with intermittent volume.
Citrus packhouses operate seasonal volume peaks November-April; we maintain dedicated Polk County and Indian River inventory to support 6-12 truckload weekly delivery during peak; standing-order pricing locks rates Oct 1.
Custom pallet pricing depends on lumber spec, build complexity, and quantity: small runs (50-200 units) typically $35-55 per unit; large runs (500+ units) drop to $22-32 per unit; quotes returned in <2 hours.
Sustainability reports provided quarterly to standing-order customers; documents pallets recycled, lumber diverted from landfill, and CO2-equivalent savings vs new-only sourcing.