How USP compares to First American Pallet for dairy & cold storage pallet buyers.
Get a Price →Pallet supplier comparison. United States Pallets serves dairy & cold storage operations with 50-pallet minimums (most national networks require 1,000+), sub-2-hour quote response, and audit-ready documentation.
Response under 2 business hours.
Heat-treatment chamber maintained at 56C core for 30 minutes per ISPM-15 Annex 1; each load shipped with a treatment certificate signed by a USDA-registered inspector.
Florida Department of Agriculture inspects pallet treatment facilities under the federal cooperative inspection agreement; our Tampa and Jacksonville locations are stamp-authorized facilities.
Citrus packers operating in Florida's three citrus belts (Indian River, Polk County, Highlands County) require Florida-specific phytosanitary documentation; we coordinate with the Florida Citrus Mutual office for compliant freight.
Standard 48x40 GMA pallets feature 5/8 inch deck boards with a 4-board face pattern; bottom configuration is 3-board for four-way fork entry; nail pattern uses 2.5 inch screw-shank galvanized fasteners.
Block pallets (four-way entry) use nine 4-inch hardwood blocks with continuous-face top deck; ideal for ASRS (automated storage and retrieval) and AGV (automated guided vehicle) operations where stringer interruptions cause read-failures.
Drop-trailer programs maintain a customer-dedicated 53-foot trailer on-site; we swap full-for-empty on a scheduled 24/48/72-hour rotation; preferred for high-throughput dock operations.
Furniture manufacturers in High Point NC (and southeast suppliers shipping to FL) use custom oversized pallets for assembled freight; 60x40 and 72x48 builds available on 5-day production lead time.
ISPM-15 export documentation included on every applicable load at no additional cost; some competitors charge $50-150 per load for the certificate; we don't.
Our Lakeland and Jacksonville recycling streams process 200,000+ pallets per year; broken stock is repaired or chipped for mulch (sold separately); zero-landfill goal targeted for 2027.